Image Description
Construction Mandatory Standard
Mandatory

Anti Surf Podiums

This mandatory standard must be applied at all construction locations:

  • Anti surf design podiums to be used at all times
  • Four castor feet design not permitted
  • Podiums to always be tagged
  • Podium inspections to be undertaken a minimum of within every seven day period.

Pat Boyle

Managing Director

Construction

Works at Height
podium
Access