Best Practice
Pipe Cutting Station
To be considered at all locations
- The picture details a pipe cutting station that can be used to reduce the manual handling, storage and waste cuttings of drainage pipe on site.
- The station has an in built “V” channel on top to lay the pipework on and provide a solid base to cut to the specified length, with any small offcuts dropping into the end waste bin.
- The station has dockets to store the various pipe bends and cuttings used for site drainage
Pat Boyle
Managing Director
Construction