Mandatory
Anti Surf Podiums
This mandatory standard must be applied at all construction locations:
- Podium platforms used on our projects shall:
- Anti-surf by design.
- 4 castor feet design not permitted.
- Inspected weekly as a minimum.
- Inspection tag displayed.
Pat Boyle
Managing Director
Construction